Load a presentation from revision history in the Producer tool

  1. In Brightspace Capture Portal or Brightspace Capture Central, on the Admin tab, in the Content area, click Presentations.
  2. Beside the presentation you want to edit, in the drop-down list, click Open in Producer.
  3. From the Revision History drop-down list, select a date and time stamp of a revision.
  4. Click Load.